SH Technical Cell

Designation: Manager
Updated: September 03, 2024
Location: Ang Thong, Thailand
Organization: Pulp and Fibre

Job Description:

Job Purpose

Carry out techno-economic feasibility studies of improvement schemes and projects, conducting Internal System and process audits. Carry out waste elimination projects to achieve organizational goals of savings in Product and Process. Execute Quality improvement projects across the organization including developing , monitoring and review of the same.

Job Context & Major Challenges

BUSINESS: PULP AND FIBRE The production of Viscose Staple Fibre (VSF) was first started in 1954 with a small capacity of 5 KTPA at Nagda (India). Today, VSF is a core business for Aditya Birla Group. It presently enjoys 23% global market share with production of 661 KTPA. The Group s VSF business operates through its four companies Grasim (India), Thai Rayon (Thailand), Indo Bharat Rayon (Indonesia) and Birla Jingwei, China. The group has also concurrently expanded its presence in Dissolving grade Pulp production to support the raw material requirement of its VSF operations and has two Pulp Plants in Canada and one in India. It has initiated a Pulp and Plantation project in Laos to strengthen its backward integration.Thai Rayon Public Co., Ltd.(TRC) TRC was incorporated in 1974, commenced production in 1976 with annual production capacity of 9000 tons of VSF which was expanded at various times. The current annual production capacity of VSF is 137240 tons & Anhydrous Sodium Sulphate 113417 tons comprising of 122640 Tons normal VSF and 14600 Tons Modal Fibre. TRC was listed on Stock Exchange of Thailand in 1984. After meeting entire domestic demand more than 50% of production volume is directly exported to various countries including Japan, USA, Canada & EU. TRC s product quality is well establi shed in international market.The Company has recently installed 5th VSF production line, revamped the oldest production line with new machinery (Line #6) and set up a gas based CS2 plant at a new location in Thailand.TRC has been earmarked to be the Centre of Excellence for specialty Modal and micro Modal VSF production. One production line has been dedicated for producing 14,700 tons of Modal fiber. Besides VSF operations, TRC has significant investments in backward & forward integration projects in Thailand, Indonesia, Canada, China, Laos and several diversification projects in Egypt and Thailand. Accredited with ISO 9001 & 14001 TRC is recipient of coveted TPM Award & one of the best employer in Thailand award in 2005 from Hewitt Associates in Thailand.

Key Result Areas

KRA (Accountabilities) (Max 1325 Characters)Supporting Actions (Max 1325 Characters)
KRA1Reducing equipment break downsEquipment Design Data for faster and effective monitoring of equipment.
¿ Equipment related data recording at central location
¿ Facilitate plant people for recording equipment related data with history of changes in common format.
¿ Prediction by NDT test about the abnormalities
KRA2Improving process and enhancing equipment performance¿ Removing bottlenecks
¿ Reducing complexity of process
¿ Coordinating with production team for technical support
KRA3Execute schemes to ensure achievement of benchmarks for consumption ratios and qualityReview systems to measure performances with trends
¿ Evaluation of proposed projects
¿ Capex Control & implementation
KRA4Effluent Treatment Plant
Monitor compliance of pollution norms (air, water, Solid) thru proper functioning of effluent treatment plant with optimum consumption of all consumables
Review plant operating parameters to ensure compliance of stipulated norms from plant reports
Execute implementation of new technology
KRA5Water Treatment Plant: Monitor uninterrupted supply of water with smooth functioning of water treatment plant.Monitoring of plant operating parameters to ensure 100% capacity utilization and meeting quality requirements

Qualifications:
Bachelor Of Technology,Master of Mechanical Engg.,Master of Chemical Engineering

Minimum Experience Level:
10-15 Years

Report to:
Manager

 
Please ensure the completeness of application. Incomplete Application will not be accepted.